Downhole: Intermitted Well Flow Study

This case study covers the installation of wireline (DX-WR) and inline (DX-I) Vortex tools in enhancing the effectiveness of automated intermitters, decreasing the flowing bottom hole pressures and, as a result (depending on the well conditions), increasing the gas production. PDF