Flowlines with Paraffin Study

This study involved placing a two-part paraffin (SX-P) tool in a flowline in Oklahoma. Prior to the Vortex installation, this line was hot-oiled every two weeks. Since the Vortex installation, hot oiling was nearly eliminated. This study also shows how and where the paraffin accumulates to be easily treated. PDF